Day 1 - Electrical Cable Wiring


Here is Room FB 208 (originally named ERP Lab), soon to be renamed to Multi Purpose Computer Lab:
Room FB 208 (previously named ERP Laboratory)


Day 1 - 11 July 2011 (9:30 am - 17:00) and here is the initial plan for the next few days (drawn on the white board):
Electrical Wiring and Ducting Installation Plan
Here is room FB 208 before installation:
View from the back of the room
View from the front (left)
The Cable Installation team (Emboy and team are busy bringing in all the materials)
The Cable Team inspecting the working area
Logistic (cable, trunking and tools) are now inside the room FB 208:
Cable, tools and trunking equipments
Now ... installation time (get to work) ... 
Cutting cable
Cutting the trunking
Drilling the floor
Installing trunking and cabling on the table ...
Installing cable under the table
Trunking under the table

Installing trunking under the table
Enjoying cable installation under the table
Trunking is almost ready on day 1 ...
Trunking at the back
Trunking at the right side
Trunking at the left side
 Day 1 end with Trunking and cable under the table ready ...