Day 3-5 (13-15 May 2011), the cable team work on the trunking and rewiring the cable under the table. Here is a sample of the new cable under the table:
|
Sample cable under the table is now tidy |
All the cables (under the table) for each of the computer is now ready ...
|
All cables are now installed under the tables. |
The raiser trunking is also ready ... this box will be replaced with new box from TE (Tyco Electronics) soon.
|
The riser trunking is ready |
Here is the plan for power distribution for each of the computer to the Main Power Fuse Box:
|
Power Distribution Plan for the room |
...