Day 18 - 23 - Network Cable Installation

Finally, on 2nd August 2011, the network cable team is ready to install the network cable.  When completed, these cables can handle maximum 10 GB data flowing in the cables. Below the snapshot of installation of the CAT 6A cables:
Cables are pulled and bundled together
The cabling team are pulling the cables

Working under the tables
Closer view:
Conduit containing the network cables
All the cables are pulled to the patch panel box at the right hand corner of the room as shown below:
Wall mount box
Zooming into the box:
Cables coming out from the conduit laid in the box
Front Cover of the box (removed)
Pak Emboy is working on the fitting for the face plate:
Fitting face plate on the conduit
Pak Sudarto Chan is explaining to Pak Arko, our Research and Community Service Director on the latest structure cabling technology:
Pak Sudarto explaining the CAT 6A cables
Here is the tool that makes the installation possible:
Cutting and crimping tools
There are more to come ...