Day 24 - 26 -- Patch Panel, Face Plate and Testing

From 3rd August until 5th August, TE Connectivity team helped in guiding us how to install and test the new cable.  The Face plate is now fixed on its place as indicated below:
Two face plate with connectors
Next, tidying up the cable coming out from iMac, so that it will look elegant:
One of the iMac with the power cable plugged under the table
Under the table, the power cable is also tidy and looks really neat. Here are the view from under the table:
Plugged cable with the cables in the guider
Another view cables under the table (guider view):
Cables in the guider
Here is the team that prepare the guider manually (almost like a masterpiece work):
Cutting, smoothing and preparing the guider
The patch panel is also ready and the overview of the box is:
The Rackmount box with the network cables inside
Opening the box, we can immediately distinguish the manufacturer right away:
AMP Connect product by TE Connectivity
The overview of the patch panel:
On top is the famous angled patch panel
The cables go from patch panel to the new 3COM switch:
Each port is now connected with the blue cable
Another angled view of the switch:
Angled view of the cables going in to the switch
The famous angled patch panel from TE connectivity:
Right Angled view of the patch panel
The left angled view of the patch panel
Finally, the view of the box when the cover is closed:
The front panel view of the rack mount box
The installation continue with testing ...